Andrew Bell of Red Rock Resources discusses second batch of assay results from the Mikei Gold Project
Episode 622, Mar 22, 2022, 11:46 AM
Andrew Bell Chairman of Red Rock Resources #RRR discusses the results of the second batch of 1,365 samples from its phase 1 RC drilling exploration programme in the mid KKM prospect of the Mikei Gold Project in Kenya.
Andrew Bell Chairman of Red Rock Resources #RRR discusses the results of the second batch of 1,365 samples from its phase 1 RC drilling exploration programme in the mid KKM prospect of the Mikei Gold Project in Kenya.
HIGHLIGHTS
o A total of 20 drill holes totalling 2093 meters were completed in the phase 1 RC Drilling Programme at the KKM Prospect and sampling and logging was done at 1 metre intervals by our in-house geological team prior to being sent to SGS Limited in Mwanza, Tanzania for accredited laboratory assay.
o Results are of second batch of 1,365 samples from the last 11 out of the 20 holes drilled in the programme. Results of the first batch of 9 drill holes (950 samples) were announced on the 7th January 2022.
o Intercepts encountered in this second batch of results include (complete collar and assay tables are given at the bottom of this release):
o KKRC095: 37m @ 0.73 g/t Au from 120m to 157m (including 5m @ 2.05 g/t Au from 135m, 1m @ 1.59g/t Au from 145m, 2m @ 2.18g/t Au from 150m)
o KKRC087: 19m @ 0.54 g/t Au from 81m to 100m (including 3m @ 1.07 g/t Au from 90m, 1m @ 2.55g/t Au from 95m)
o KKRC091: 12m @ 0.65 g/t Au from 79m to 91m (including 1m @ 1.2 g/t Au from 81m, 3m @ 1.24g/t Au from 83m)
o KKRC103: 10m @ 1.5g/t Au from 61m to 71m (including 3m @ 1.02 g/t Au from 61m, 5m @ 2.23 g/t Au from 67m)
o KKRC089: 8m @ 1.23g/t Au from 87m to 95 m (including 4m @ 1.81 g/t Au from 87m, 2m @ 1.07 g/t Au from 92m)
Other intercepts already reported in the first 9 holes of:
o KKRC102: 17m @ 1.02 g/t Au from 116m to 133m (including 1m @ 3.15 g/t Au)
o KKRC082: 6 m @ 1.17 g/t Au from 8m to 13m (including 1m @ 3.75 g/t Au)
o KKRC101: 4m @ 1.37 g/t Au from 83m to 87m (including 1m @ 2.7 g/t Au)
· KKM is the Mid Prospect of the five main MGP Prospects and has an Indicated and Inferred (JORC 2012) Resource of 371.3 Koz Au. Gold mineralization at KKM is both structurally and chemically controlled through a regional NW-SE trending shear zone and its rich quartz porphyry intrusions and graphitic shale envelopes respectively.